Construction of a Prefabricated Modular Building for a Thermal Disinfection and Decontamination Station for Pathogenicity Groups III–IV Effluents
20.04.2023
Customer: JSC "Shchelkovo Agrokhim"
With the design phase successfully finalized, INEX specialists have transitioned to the next critical stage: the installation of Clean Production Facilities (CPF) at the JSC Schelkovo Agrokhim site. The project involves the setup of a specialized purification unit for technical pharmaceutical substances and the installation of the general ventilation system for the production area (Building 115, Workshop No. 1).
As part of our comprehensive contractual obligations, INEX experts are performing and supervising the following specialized works:
-
Architectural & Structural Solutions: Finalizing the cleanroom envelope and structural integrity.
-
Electrical Engineering: Complete wiring and power distribution for the production site.
-
Water & Sanitation: Advanced plumbing and drainage systems for pharmaceutical use.
-
HVAC & Refrigeration: High-precision climate control and cooling systems.
-
Complex Security Systems: Installation of fire alarms, evacuation management (SOUE), technical video surveillance, and access control (ACS).
-
Technological Gases: Distribution networks for specialized industrial gases.
-
Integrated Automation: Advanced control systems to manage all facility utilities.
[Image: Construction team installing cleanroom panels with precision alignment]
About the Client: JSC Schelkovo Agrokhim is a leader in the production of plant protection products, with a portfolio of over 160 items, including herbicides, fungicides, and microbiological preparations. The company operates under the ISO 9001:2015 quality management system, requiring the highest level of technical equipment and cleanroom standards—requirements that INEX is uniquely qualified to fulfill.
[Image: Site overview showing the integration of HVAC and electrical systems in the new production unit]
Regulatory Compliance (RF)
All construction and installation works are carried out in strict accordance with:
-
EAEU GMP: Ensuring the facility is built to support pharmaceutical-grade manufacturing and prevent contamination.
-
ISO 14644 (GOST R ISO 14644): Governing the installation and testing of cleanrooms.
-
National Building Codes (SP and SNiP): Regarding fire safety, electrical installation, and structural reliability.
-
ISO 9001:2015: Aligning with the customer's quality management standards for analytical control at all production stages.



